Gas boiler K21 at Veolia Olomouc peak heating plant
A steam gas boiler room reconstruction with a 20MW output (superheated steam) in the peak heating plant premises of Veolia Energie ČR in Olomouc.

- Contract type: Design & Build
- Implementation date: 05/2022–05/2023
- Customer: Termonta Praha a.s.
- Investment costs: 90,400,000 CZK excluding VAT